Skip to content

Manufacturing Engineering MCQ Questions

0
Answered
0
Correct
0%
Accuracy
Q251 Easy

What is a BOM organized into?

Subassemblies
Workunits
Kits
Parts
Q252 Easy

When did the RoHS regulations take affect?

January 1, 2007
July 1, 2009
July 1, 2006
Q253 Easy

Why designs are periodically modified?

To strive for zero-based rejection and waste
To make products easier and faster to manufacture
To improve product performance
All of the mentione
Q254 Easy

Utilization is a percentage or what?

CAGR
Dimension
KPI
NPS
Q255 Easy

Textile Engineering is a field that primarily deals with the design, production, and processing of which material?

Metal
Glass
Plastic
Fiber
Q256 Easy

What is the opposite of Continuous Flow Manufacturing?

Injection molding
Shelf life
Positioning
Batch production
Q257 Easy

Which casting process has no size and shape limits?

Sand casting
Shell-mould casting
Plaster-mould casting
None of the above
Q258 Easy

In resistance electric welding, the current passed through two joining metal pieces is

230 to 440 volts, at a high amperage
230 to 440 volts, at a low amperage
2 to 8 volts, at a high amperage
2 to 8 volts, at a low amperag
Q259 Easy

What is the name of the standards and guidelines for environmental management systems?

ISO 14000
ISO 50001
ISO 14001
ISO 9001
Q260 Easy

What are finished goods in a manufacturing environment?

Materials
Products
Raw materials
Parts
Q261 Easy

Which welding defect is characterized by a gap or hole in the weld caused by incomplete fusion?

Porosity
Inclusion
Undercut
Lack of fusion
Q262 Easy

What is the purpose of Revision Control?

To ensure that changes to a product, part, process, program, design or document are properly documented and tracked
Ensuring that all changes are properly documented and tracked so they can be accurately reverted if necessary
Preventing the accidental or unauthorized alteration of a product, part, process, program, design or document
The process of tracking and documenting changes to a product, part, process, program, design or document
Q263 Easy

What type of customers experience is measured by VoC?

Experiences with the company
Experiences with the team
Experiences with the product
Experiences with the support
Q264 Easy

What is the Standard Operating Procedure document used for?

Recording and documenting every step of a process
Increased efficiency and quality assurance
Managing resources
Controlling the budget
Q265 Easy

What is an item that appears in the BOM of another item called?

A screwdriver
A tool
A child
A screw
Q266 Easy

Which of the following software performs the data entry, design, analysis, drafting, and manufacturing functions?

Graphics software
Programming software
Operating software
Application softwar
Q267 Easy

What can CAD software do?

Draft 3D models
Create digital drawings
Generate 3D models
Design and render 2D and 3D models
Q268 Easy

Which field of textile engineering focuses on the development of advanced textile materials with unique properties, such as flame resistance or moisture management?

Textile Chemistry
Technical Textiles
Textile Testing
Textile Recycling
Q269 Easy

What does an EBOM represent only?

Service
Ticket
Sale
Physical product
Q270 Easy

What is NPD also referred to as?

Sales
Marketing research
Planning
Product development
Q271 Easy

What does the CMM ensure are correct?

Processes
Measurements
Outputs
Management Policies
Q272 Easy

What is the acronym for Just in time?

Just in Time Manufacturing
JIT
Just in time delivery
Just-in-time production
Q273 Easy

What discipline can be applied to analyzing downtime?

Software development
Service management
Manufacturing
System administration
Q274 Easy

What is another name for AML?

American Made List
Approved manufacturer list
American medical laboratory
Association of Medical Laboratory Technologies
Q275 Easy

Open-loop control system is

Less accurate than closed-loop control system
More accurate than closed-loop control system
Equally accurate to closed-loop control system
Cannot say
Q276 Easy

How is TEEP used to determine a production environment's potential?

By simulating production conditions on a computer
By monitoring environmental factors
To identify and evaluate potential new equipment
Based on the performance level of its current equipment
Q277 Easy

What is the acronym used to refer to supplier corrective action requests?

SCMR
SCAMS
SPRI
SCAR
Q278 Easy

What is the name of the EDA software package from Mentor Graphics?

Cadence Design System
DxDatabook
Protel
Altium Designer
Q279 Easy

The process of combining two or more distinct polymer molecules to form a new product with different characteristics is called as

Binding
Stabilising
Filling
Blending
Q280 Easy

What is used to hold mechanical CAD files?

PDM System
Printer
Computer
Q281 Easy

The operation of smoothing and squaring the surface around a hole is known as

Counter-sinking
Counter-boring
Trepanning
Spot facing
Q282 Easy

What is a common name for all of a product's information?

Product Image
Package
Product Description
Product Record
Q283 Easy

What is the third term used to describe the identifying characteristics of an item?

Size
Fit
Color
Material
Q284 Easy

What does NPI stand for?

National Pharmaceutical Institute
National personal identification number
National product identification
New product introduction
Q285 Easy

The accuracy of micrometers, calipers, dial indicators can be checked by a

Plug gauge
Slip gauge
Ring gauge
Feeler gauge
Q286 Easy

What documents documents the official approval of a requested change?

Engineering Change Notice
Change Control Board Meeting Minutes
Change Request Memo
Change Request
Q287 Easy

What is the ISO 13485 Quality system standards and guidelines for the development of?

Hospital procedures
Animal health products
Pharmaceuticals
Medical devices
Q288 Easy

Quality management system Documents all aspects of a company's design and operational controls, including what?

Monitoring
Analysis
Communication
Quality assurance
Q289 Easy

What goal does the MES have on the factory floor?

Reducing defects
Reducing the total time
Ensuring the quality of the product
Increasing output
Q290 Easy

Compliance Mark is listed on what to show compliance?

Product or its packaging
Documents related to the product
Instructions for use
Regulation
Q291 Easy

How much downtime is there in the industrial world?

This is how long it usually takes to repair or replace equipment
This is the amount of time it takes to restart or reactivate a plant
The amount of time an average worker spends away from the plant
This is the amount of time a plant or particular cell, line, or machine is down, or off-line
Q292 Easy

Which of the following options best describes the centre lathes?

Machining machines
Shaping machines
Turning machines
None of the above
Q293 Easy

What is the purpose of a welding process in Welding Engineering?

Cutting and shaping metal
Joining two or more metal parts together
Polishing and finishing metal surfaces
Coating metal surfaces for corrosion protection
Q294 Easy

What is the acronym for Corrective Action Preventative Action?

CAAP
CARP
CAPA
CAP
Q295 Easy

Which of the following software is used to provide the users with various functions to perform geometric modeling and construction?

Graphics software
Programming software
Operating software
Application softwar
Q296 Easy

What is a formal ECN?

Order entry
Execution
Error correction notice
Engineering change notice
Q297 Easy

There are a couple of different types of manufacturing production processes. A make to assemble strategy focuses on having what available?

Readily made parts
Quick assembly
Low cost
Parts that are readily available
Q298 Easy

The OPC standards apply to what?

Telecommunications
Industrial telecommunication
Computing
Wireless networks
Q299 Easy

Which of the following production processes is least flexible?

Job order production
Batch or quantity production
Mass production
None of the above
Q300 Easy

What process control tool helps with monitoring and controlling processes?

Error Analysis and Control
Statistical Process Control Using
Process Automation
Error Monitoring and Control
Showing 300 of 356 questions

Teachers: using these Manufacturing Engineering questions with a class? Tell us about your class.

Report a mistake

What's wrong?